Construction of water transport and distribution projects and Anavalos networks in the municipalities of Asklipios and Epidaurus (Construction of Tank D3).
Client : ΑΡΙΑΔΝΗ ΜΗΧΑΝΙΚΗ ΑΤΕ
Objective : Construction, Rebar, Concrete
Description : Iron reinforcment placement works as well as the construction and concreting works of all the elements of the tank D3. Bottom, walls, wells.
Transportation and Distribution Projects of Irrigation Water from Anavalos Networks to the Municipality of Ermionida, Argolida Prefecture
Client : ΤΕΚΑΛ Α.Ε.
Objective : Construction, Rebar, Concrete
Description : Construction of the concrete structures of Reservoirs D1, D2, D3 and the possibility of expansion to D4, of Pumping Stations A1 and A2, of typical pieces (= Manholes, box culverts, tiled roof pipeline, technical adaptation, support, anchoring and pipeline passage bodies), the installation of iron reinforcement in the above Tanks and Pumping Stations and the construction and installation of iron reinforcement in the typical pieces of the project